Monday, September 23, 2024

9:05 She is very active upstairs, since 6 AM. Now that the smell coming from bins has been minimized (threw some more backing soda last night) i can clearly feel the smell of sewage coming here with every of her step. I think there is a sewage leak coming from upstairs. I can very rarely hear the toilet flushing in there, maybe less than once a week if ever.

9:09 Went to the other side of the room where the stairs can be seen through the window to plug in the audio recorder in the charger on Angela's desk and she came down the stairs, ft away from me and then to the car.

11:12 Muscle car...

11:35 Look ma! No boobs! 6:05 Went and disposed of a number of bags. It was still smelling so i walked beyond the mailbox alley and there was one there but i did not have a bag. Came and grabbed a bag, knotted two more at the W bin but when i tried to go beyond that alley there was this guy in green T-shirt, sitting there, not being bothered by it or even guarding it. Half more hour until they can bring some more in the other bins i just cleaned so they can ensure continuity.

9:55 In the last few days (weeks) humidity inside is constantly above 65%. Today i was committed to open the basement window to take a picture inside. I suspect there are again leaks in the drier's exhaust. If not completely broken.

I don't know how they got away with breaking building codes like this. I mean, instead of passing those exhausts to the closest wall, they directed them to the basement.

When they did work on the siding, they left that window open for a few days. It was then when i went and fixed the exhaust pipes that were fallen to the ground or leaking.

However when they installed the new window, they screwed it real hard. However, 2 of the 9 screws are missing, allowing "air" from the basement to come at our door which is ft away. Just removed one of the  screws to measure it.

I believe the same iSage construction guys cut a new window on the other side of the building. Here are both of them.